PUTTING GREEN CONSTRUCTION

Layout of putting green and installation of 4"-6" of compacted granite.
Digging the hole for the cup into base material
Cup placed into the drain pipe
Ready to cement in the cup
Leveling the cup
Drain pipe cemented into the base material
Installation of metal cups inside of drain pipes.
Layout of putting green material.
Infilling of Turf Up silica sand.
Rolling of fibers and final compacting.
Rolling of fibers and final compacting.
The finished product.
 
Speed of putting green surface set between 10 and 12 on the Stemp Meter.